RESOLUTION AWARDING CONTRACTS TO NORTHLAND CONSTRUCTORS OF DULUTH, INC.; ULLAND BROTHERS, INC. AND MONARCH PAVING COMPANY FOR BITUMINOUS (HOT MIX BLACKTOP) FOR STREET MAINTENANCE ACTIVITIES IN 2022.
Body
CITY PROPOSAL:
RESOLVED, that the proper city officials are hereby authorized to enter into a contract with Northland Constructors of Duluth, Inc. (Northland) for bituminous for street maintenance activities in 2022 for an estimated amount not to exceed $161,990, payable from 290-500-5222 (street system maint utility; public works and utilities; blacktop)
FURTHER RESOLVED, that the proper city officials are hereby authorized to enter into a contract with Ulland Brothers, Inc. (Ulland) for bituminous for street maintenance activities in 2022 for an estimated amount not to exceed $182,000, payable from 290-500-5222 (street system maint utility; public works and utilities; blacktop)
FURTHER RESOLVED, that the proper city officials are hereby authorized to enter into a contract with Monarch Paving Company (Monarch) for bituminous for street maintenance activities in 2022 for an estimated amount not to exceed $55,700, payable from 290-500-5222 (street system maint utility; public works and utilities; blacktop)
Statement of Purpose
STATEMENT OF PURPOSE: This resolution authorizes the split award of the bituminous needed for street maintenance activities for the 2022 construction season. The total amounts requested are estimates only, and do not guarantee that a minimum amount of product will be purchased from any vendor.
Bituminous specifications are based on the current MN Department of Transportation Construction Standards. Two bituminous mixes are used by the city, and the product is picked up on an as-needed basis by street maintenance crews.
The purchasing division posted an Invitation for Bids on March 10, 2022 and received three bids by the due date. The bids were evaluated based on the total overall cost to the city, factoring in the bid price and the estimated labor and equipment costs to travel to each company’s plant location.
Splitting the award allows the city to purchase material from any of the three vendors depending upon the location of the project and the availability of a particular mix.
SPWEA 340B TTWESpecial
Company Bid Price/Ton Bid Price/Ton Plant Location
Northland Constructors $69.50 $120 Helberg Drive
Ulland Brothers $67 $96 Oscar Pit Hwy 4
Monarch Paving $82.20 $111.40 Superior, WI